2011-12-29 Workshop Progress

Following the insulation inspection, Charlene and I got the Enkadrain on the roof yesterday, and today we got the edge grating in place. I'll need to run in a whole bunch more lag screws and put on the top piece, which will be a routed Trex piece of 2x2.

     

Oh, look, more materials! The trex top edge, the floor sheathing, and the interior wallboard.

 

Category: Dan Lyke life Category: 10 Mission Category: Workshop